ABSTRACT

Agricultural Engineering Department - Pilot Project to improve the irrigation efficiency of Electrical farm pumpsets - Transformer pilot project - Sanction of Rs.21.38 lakhs for implementation - Orders issued.


AGRICULTURE (AE.I) DEPARTMENT

G.O.(Ms).NO. 74                                                    

DATED: 20-2-2004

READ:-

1. G.O. Ms. No.434, Agriculture, dated 7-10-2003.

2. From the Chief Engineer (Agricultural Engineering) (in-charge), Chennai-35, letter No.FA2/60269/2003, dated 27-1-2004.

-----------

ORDER:

In order to increase the efficiency of irrigation, to increase the area under cropping and to improve cropping intensity, a project has been formulated by Chief Engineer (Agricultural Engineering) in the letter read above for replacement of old pumpsets by energy efficiency new pumpsets. The Chief Engineer (Agricultural Engineering) has reported that the 500 pumpsets selected for the study on electrical energy consumption by Tamil Nadu Electricity Board will also be considered in this project subject to willingness of the farmers to participate in this programme giving 50% cost as their contribution. The project will be with 50% support to farmers with total cost of Rs.1000/- lakhs. The Government have examined the proposal of Chief Engineer (Agricultural Engineering) and it has been decided that a pilot project can be taken up in 3 regions, viz. Theni, Villupuram and Coimbatore and should cover one transformer area in each region. The impact of study should cover power consumption water saving and farm productivity involving Tamil Nadu Electricity Board and Tamil Nadu Agricultural University. Accordingly, the Chief Engineer (Agricultural Engineering) has sent a revised proposal to cover 167 farmers in an area of 362 hectares in the above 3 districts, at a total cost of Rs.179.685 lakhs of which Rs.56.03 lakhs will be subsidy and 123.655 lakhs will be farmers contribution as loan. The project costs to improving the efficiency of electrical pumpsets are indicated in the Annexure-I to this order.

2. The Government accept the above revised proposal of the Chief Engineer (Agricultural Engineering) and accordingly issue the following orders. Out of the total cost of the project of Rs.179.685 lakhs, Rs.56.03 lakhs will be subsidy and Rs.123.655 lakhs will be farmers contribution. Out of the above subsidy amount of Rs.56.03 lakhs, the subsidy through micro irrigation of Rs.34.65 lakhs sanctioned in the G.O. first read above will be dovetailed from the drip irrigation programme under the following head of account:-

"2401.00.Crop Husbandry-119. Horticulture and Vegetable crops - Schemes in Tenth Five Year Plan-II. State Plan - KX. State scheme for drip and sprinkler to cover farm pumpsets particularly in Ground water stresses Blocks - General."

The balance subsidy of energisation of Rs.10.855 lakhs and water harvesting of Rs.10.525 lakhs to a total cost of Rs.21.38 lakhs are hereby sanctioned. The scale of subsidy to be provided is furnished in the Annexure-II to this order. The cost of water harvesting structure will be based on actual need and should not exceed Rs.10.525 lakhs.

3. The expenditure of Rs.21.38 lakhs sanctioned in para 3 above shall be debited to the following new sub head of account to be opened under demand No.5 - Agriculture, "2401.00 Crop Husbandry - 800. Schemes in the Tenth Five Year Plan-II State Plan.JZ - Scheme for improvement of income of farmers operating pumpset irrigated land-09. Grants in Aid-03. Grants for Specific schemes. 2401-00-800-JZ - 0935".

4. The Chief Engineer (Agricultural Engineering) is the estimating, reconciling and controlling authority for the above new head of account. The Pay and Accounts Officer / Treasury Officer are requested to open the above new head of account in their accounts.

5. Necessary provision of funds has been included in Final Modified Appropriation 2003-2004. The Pay and Accounts Officers / Treasury Officers are requested to admit the bills, if it is otherwise found in order. This will be included in the next supplementary estimates.

6. This order issues with the concurrence of Finance Department vide its U.O. No.26/SS (Dr. KSG)/04, dated 20-02-2004.

(BY ORDER OF THE GOVERNOR)

R. KANNAN,
Agricultural Production Commissioner and Secretary to Government

To

The Chief Engineer (Agricultural Engineering), Chennai-35.

The Accountant General, Chennai-35.

The Accountant General, Chennai-18.

The Pay and Accounts Officer (South), Chennai-35.

The Treasury Officer, Theni / Villupuram and Coimbatore.

Copy to :

The Chairman, Tamil Nadu Electricity Board, Chennai-2.

The Special Commissioner and Director of Agriculture, Chennai-5.

The Finance Department, Chennai-9.

The Chief Minister's Office, Chennai-9.

The Senior Personal Assistant to Minister for Agriculture, Chennai-9.

The Member Distribution, Tamil Nadu Electricity Board, Chennai-2.

The Vice Chancellor, Tamil Nadu Agricultural University, Coimbatore-3.

The Chief General Manager, NABARD, Nungambakkam, Chennai-34.

Forwarded / By Order

Section Officer.

 

ANNEXURE - II

PILOT PROJECT TO IMPROVE THE EFFICIENCY OF ELECTRICAL PUMPSETS

SCALE OF FINANCE

Sl. No.

(1)

Component of work

(2)

Unit cost

(3)

Subsidy

(4)

Loan

(5)

1.

Replacement of Motor and Electrical Pumpset

Rs.5,000

Rs.5,000

---------

2.

Electrical Pumpset Installation

Rs.3,000

Rs.1500

1500

3.

Farm Pond/No.

Rs.5,000

------

Rs.5,000

4.

Drip Irrigation / hectare

Rs.50,000

Rs.12,500

Rs.37,500

5.

Sprinkler Irrigation /hectare

Rs.30,000

Rs.7500

Rs.22,500

R. KANNAN,

AGRICULTURAL PRODUCTION COMMISSIONER AND SECRETARY TO GOVERNMENT

// True Copy //

Section Officer.

ANNEXURE I

ABSTRACT COST OF PROJECT

Sl.
No.

District

No.of farmers

Area ha.

Subsidy for Micro Irrigation

Subsidy 
for Energi
sation

Total subsidy

Water Harves
ting

Project cost subsidy Elec pumpsets 6+8

Project cost with Micro Irrigation subsidy 5+9

Loan Comp
onent

Total subsidy and Loan

1

2

3

4

5

6

7

8

9

10

11

12

1

Villupuram

50

132

1290000

325000

1615000

325000

650000

1940000

4245000

6185000

2

Theni

40

110

825000

260000

1085000

422500

682500

1507500

2755000

4262500

3

Coimbatore

77

120

1350000

500500

1850500

305000

805500

2155500

5365500

7521000

TOTAL

167

362

3465000

1085500

4550500

1052500

2138000

5603000

12365500

17968500

R. KANNAN,

AGRICULTURAL PRODUCTION COMMISSIONER AND SECRETARY TO GOVERNMENT

// True Copy //

Section Officer.

 

 

 
 

 

|       Home       |       About Us       |       Services       |       IPR Facilitation Cell       |       Feedback       |       Contact Us       |       Events       |
Tamil Nadu Technology Development & Promotion Centre Copyrights 2006.